Asbestos removal
Asbestos removal for business and housing associations
Authorised asbestos removal in buildings that stay in use, with one complete case file for the building project.
Who we work for
Housing associations and property managers
We clear asbestos from roofs, basement pipes and bathrooms in many flats at once. The work is planned in stages so residents can stay, we write the resident information together with you, and you get one case file per property for the maintenance plan.
Contractors and demolition
We remove asbestos that turns up in the middle of a conversion, and clear hazardous materials before demolition begins. As a subcontractor we follow your QA procedures, attend site meetings, seal our own zone and document our own work. We coordinate with the trades that come in before and after us.
Municipalities and public clients
We work in schools, institutions and offices that have to stay in use while the work goes on, and document to the requirements in the tender.
Businesses
We work in production areas, warehouses and offices while operations carry on, and agree with you when heating, water and ventilation are off.
Environmental screening before you demolish or convert
Before demolition, renovation or larger maintenance that affects more than 10 m² or produces more than 1 tonne of waste, you as the building owner must screen the building for problematic substances and notify the waste to your municipality. Asbestos is one; lead, PCB, chlorinated paraffins and heavy metals are the others. The notification is in your name, and we help with the figures.
We can take care of the asbestos part: we arrange samples of the materials the project affects and a laboratory analysis, and you get a survey with sample locations, results and extent that a tender or a quote can be built on. Read more about the asbestos survey.
Asbestos removal while the building stays in use
We work zone by zone. Each area is sealed with an airlock and negative pressure, cleared, cleaned, measured by agreement and released before the next one is closed. Work in common areas, plant rooms and basements is scheduled outside opening hours where needed, and residents and users are told when which areas are closed and when heating and water are off.
Documentation you can build on
After the removal you get one complete case file per property or stage with:
- A copy of the notification to the Working Environment Authority.
- Laboratory results for the materials that were tested.
- The sealing and work plan with the zones and materials the work covered.
- The receipt from the approved waste site for the asbestos waste delivered.
- The check before release: a description of the cleaning and inspection, and the clearance measurement result where one was agreed.
Encapsulated material that stays in place is labelled and recorded in the file, so the next tradesperson knows what is behind it.
What the price includes
- Notification of the work to the Danish Working Environment Authority
- Sealing with an airlock and negative pressure, zone by zone
- Protective equipment and respirators for everyone in the zone
- Removal or encapsulation of the asbestos-containing material
- Packing, transport to an approved waste site and the landfill fee
- Cleaning of the zone and one complete case file for your quality assurance
Questions and answers
Another question? Email kontakt@verdan.dk
Do we have to notify the Working Environment Authority ourselves?
No. We notify the work as the company carrying it out, before it starts, and you get a copy. If we are a subcontractor on your site, we coordinate the notification with your health and safety plan, and you get records of the occupational health and safety training everyone on the job holds. The waste notification to the municipality, however, is filed in your name as the building owner; we help with the figures.
What happens if you find more asbestos than expected?
We stop, document the find and agree an updated written quote and a new schedule with you before we continue.
Do you work from our consultant's survey?
Yes. If you have an environmental consultant, client adviser or health and safety coordinator on the job, we work from their survey and report in the format they use. If you don't, we say so when the job is big enough that you should have one.
How soon can you start?
We agree that based on your schedule. The work has to be notified to the Working Environment Authority before it starts, and for larger jobs your waste notification to the municipality also has to be in place. Start and stages are in the quote, so you can plan operations and resident information around them.
What does asbestos removal for business cost?
It depends on material, extent, access and how much ongoing use has to be accommodated. You get a fixed written quote excl. VAT based on your details, and the price in the quote is the price on the invoice as long as the extent doesn't change. If anything is unclear, we come out and look at the job free of charge.
Another question? Email kontakt@verdan.dk
Other services
-
Asbestos and fibre-cement roofs
We take down asbestos roof sheets, wrap them and take them to an approved waste site. Learn more about Asbestos and fibre-cement roofs -
Tile adhesive and floors
We remove asbestos tile adhesive, vinyl and floor glue in bathrooms, kitchens and on floors, with the area sealed off and under negative pressure. Learn more about Tile adhesive and floors -
Pipe insulation
We remove or encapsulate asbestos pipe insulation in basements and plant rooms with containment and negative pressure. Learn more about Pipe insulation -
Ceilings and walls
We remove ceiling boards, wall boards and asbestos filler room by room with an airlock and negative pressure. Learn more about Ceilings and walls -
Asbestos survey
We arrange sampling and analysis before a renovation. Learn more about Asbestos survey